Tag Archives: wood fired kiln

Loading kiln

Here is the beginning of the last stacks. I will be able to do a 3 shelf stack as this room is a little bigger than the back room. I put the first level directly on the floor tiles in … Continue reading

Posted in Uncategorized | Tagged , | Leave a comment

Kiln loading

Here are some pictures of loading for my next firing. This is the back room, closest to the chimney. I have the back of the back room done and the front set of shelves almost done. The front set I … Continue reading

Posted in Uncategorized | Tagged , , | Leave a comment

Repairing brick arch in place.

I have finally finished glazing the first 500 bowls of my 1,000 bowl firing. These bowls will make up the first firing, 250 in first room, 250 in second. These pictures show the first room and second room as I … Continue reading

Posted in Uncategorized | Tagged , , , | Leave a comment